Shenzhen Xinhua Life Insurance Tower
approx. 18,000 tons
Total Tonnage

Completion
2024
Location
Qianhai, Shenzhen, China
Category
Landmark Building
Have a steel fabrication or procurement need?
Send your drawings and quantities for a drawing-based review and quote.
FindingSteel (GUANGDONG JIANGXIN AUTO-MANUFACTURE STEELSTRUCTURE CO., LTD., Foshan Gaoming) participated in detailing, shop fabrication and installation support for the Xinhua Life tower steelwork in Qianhai, Shenzhen. Case file: about 198 m tall, about 18,000 tons of steel. Not the civil main contract.
Construction Process
Detail Design
Scheduling
Fabrication
Quality Inspection
Installation
01
At a glance
• Project: Xinhua Life Insurance Tower, Qianhai, Shenzhen
• Height in case file: about 198 m (about 40 floors / 4 basement)
• Steel in case file: about 18,000 tons
• System: SRC core + steel perimeter frame
• Jiangxin scope: detailing, fabrication, installation support
02
Project overview
Located in the core position of Shenzhen Qianhai Cooperation Zone, Shenzhen Xinhua Life Insurance Tower is a super high-rise landmark building with a total height of about 200 meters. The project has a building area of about 120,000 square meters, 4 underground floors and 40 above-ground floors, with a building height of 198 meters.
03
Technical highlights
• Synchronous construction technology of super high-rise core tube and outer frame columns: Adopting steel reinforced concrete core tube + steel frame outer frame structure system.
• High-strength Q460 steel application: Main structure uses Q460GJC high-strength building steel with yield strength of 460MPa.
• Full-process digital BIM technology control: Using Tekla Structures for 3D detailed design.
• Complex node design optimization: Using seismic performance-based design for SRC transfer layer nodes.
• Ultra-high-rise construction verticality control: Using total station real-time monitoring technology.
04
What we supplied
• Steel Structure Deepening Design and Modeling: Using Tekla Structures for 3D modeling, completing component numbering, material statistics, and node design.
• Steel Component Manufacturing: a 25,000㎡ production base with annual design capacity of 40,000 tons, using CNC cutting, first-article approval, dimensional reinspection and an integrated H-beam production line to release members against approved drawings and project acceptance requirements.
• On-site Installation Support: a professional installation team provides technical support and erection coordination.
• Engineering Quality Inspection and Acceptance: In-shop checks plus NDT (ultrasonic and magnetic particle testing), with records archived.
05
Quality and delivery
• Mill certs follow heat numbers.
• Members marked by floor and lift order; shop and site use one drawing revision.
06
Key figures (case-file, approx.)
Location: Qianhai, Shenzhen
Height: about 198 m
Floors: about 40 above / 4 below
Steel: about 18,000 tons (case file)
System: SRC core + steel frame
Plant: Yanghe, Gaoming, Foshan; 25,000 m²; 40,000 t/year
Fabrication control: CNC cutting; first-article approval; dimensional reinspection to approved drawings
07
FAQ
Q1: Are the tons and height contract quantities?
A: No. About 198 m and about 18,000 tons are case-file figures; use the contract and approved drawings for settlement.
Q2: Did Jiangxin take the civil main contract?
A: No. Scope is steel detailing, shop fabrication and installation support.
Q3: Is Q460 used on every member?
A: The case file cites Q460GJC on primary members. Use the approved material list per piece.
Q4: What is needed for a quote?
A: Drawings, quantities, span/loads and coating or fire-protection requirements. We reply after a drawing-based review.
Have a steel fabrication or procurement need?