Qianhai Financial Holding Tower

approx. 6,800 tons

Total Tonnage

Qianhai Financial Holding Tower

Completion

2023

Location

Qianhai, Shenzhen, China

Category

Landmark Building

Have a steel fabrication or procurement need?

Send your drawings and quantities for a drawing-based review and quote.

FindingSteel (GUANGDONG JIANGXIN AUTO-MANUFACTURE STEELSTRUCTURE CO., LTD., Foshan Gaoming) fabricated and supported erection of the crown / feature steel on Qianhai Financial Holding Tower. Building height about 245 m. About 6,800 tons here is the crown package in the case file, not the whole tower.

Construction Process

Detail Design
Scheduling
Fabrication
Quality Inspection
Installation
01

At a glance

• Project: Qianhai Financial Holding Tower • Building height: about 245 m • Steel on this page: about 6,800 tons (crown package, case file) • Jiangxin scope: crown steel detailing, fabrication, installation support • Not in scope: full-tower steel or civil main contract
02

Project overview

Qianhai Financial Holding Tower is located in the core area of Shenzhen Qianhai Cooperation Zone, with a building height of 245 meters, total construction area of approximately 180,000 square meters, 50 above-ground floors and 4 underground floors.
03

Technical highlights

• Ultra-high spatial modeling steel structure design: Adopting spatial special-shaped steel structure system with multi-level cantilever and inclined column conversion. • High-altitude segmented lifting technology: For 245m high-altitude operations, using ground pre-assembly and segmented lifting schemes with 400tm tower cranes. • Spatial coordinate precise positioning: Using GPS-RTK 3D coordinate positioning technology combined with total station real-time verification. • Special wind and seismic design: The modeling steel structure is designed according to 100-year wind load and rare earthquake conditions. • Curtain wall support steel structure integration: The modeling steel structure is organically combined with the glass curtain wall support system.
04

What we supplied

• Spatial steel structure deepening design: Using Tekla Structures for 3D solid modeling, completing development and blanking calculations for special-shaped components. • Special-shaped steel component fabrication: Using 3D CNC cutting, laser welding and other advanced processes. • High-altitude installation and on-site splicing: Equipped with professional high-altitude operation teams, using 3D hydraulic synchronous lifting technology. • Full-process quality inspection: Establishing special quality control system for high-altitude operations.
05

Quality and delivery

• Key welds re-measured after welding, with records kept. • Members marked to the install order; mill certs travel with the cargo.
06

Key figures (case-file, approx.)

Location: Qianhai, Shenzhen Height: about 245 m Floors in file: about 50 above / 4 below Steel this page: about 6,800 tons (crown) GFA in file: about 180,000 m² Plant: Yanghe, Gaoming, Foshan; 25,000 m²; 40,000 t/year
07

FAQ

Q1: Is 6,800 tons the whole tower? A: No. It is the crown package in the case file. Another record mentions about 3,500 tons for a segment. Write “about” and name the segment. Q2: Did Jiangxin take the civil main contract? A: No. Scope is crown steel detailing, fabrication and installation support. Q3: Is 245 m exact? A: Write about 245 m as a building figure. Q4: What is needed for a quote? A: Drawings, quantities, span/loads, coating or fire-protection requirements; we review against drawings.