BYD Energy Storage Tech Park
approx. 32,000 tons
Total Tonnage

Completion
2023
Location
Guangdong, China
Category
Industrial Park
Have a steel fabrication or procurement need?
Send your drawings and quantities for a drawing-based review and quote.
FindingSteel (GUANGDONG JIANGXIN AUTO-MANUFACTURE STEELSTRUCTURE CO., LTD., Foshan Gaoming) fabricated and delivered steel for BYD energy-storage campus phase I. Case file: about 12 shops, land about 141,900 m², steel about 32,000 tons — a case-file figure, not a settled contract quantity.
Construction Process
Detail Design
Scheduling
Fabrication
Quality Inspection
Installation
01
At a glance
• BYD energy-storage campus, phase I
• About 12 shops
• Land about 141,900 m²; building area in file about 280,000 m²
• Steel about 32,000 tons (case file)
• Scope: shop steel fabrication and delivery; not campus main contract
02
Project overview
BYD Energy Storage Park is located in Guangdong Province, one of the largest energy storage battery production bases invested by BYD. Phase I covers 141,900 square meters, including 12 steel structure factories with total construction area of approximately 280,000 square meters.
03
Technical highlights
• Large-span portal frame design: Using 12-15m span portal frame structure with maximum single span of 18m.
• Efficient anti-corrosion coating system: Using epoxy zinc-rich primer + polyurethane topcoat for acid-alkali environment.
• Rooftop photovoltaic integrated design: Reserve roof photovoltaic support installation conditions.
• Digital prefabricated construction: Using BIM technology for deepening design with all steel components prefabricated in factories.
• Fast construction organization: 12 factories delivered in batches with reverse scheduling and parallel construction.
04
What we supplied
• Industrial plant steel structure deepening design: Using Tekla Structures for 3D modeling.
• Intelligent manufacturing: 25,000㎡ smart production base with 6 H-beam production lines.
• On-site installation and general contracting: Professional industrial plant installation team.
• Envelope system supporting: Providing metal roofing, wall sandwich panels, daylighting panels.
05
Quality and delivery
• One detailing standard across buildings; marks include building number and lift order.
• Coatings follow the drawing; mill certs travel with each batch.
06
Key figures (case-file, approx.)
Location: Guangdong, China
Shops: about 12
Land: about 141,900 m²
Building area in file: about 280,000 m²
Steel: about 32,000 tons
Plant: Yanghe, Gaoming, Foshan; 25,000 m²; 40,000 t/year
07
FAQ
Q1: Which tonnage is right — 32,000, 22,000 or 15,000?
A: The register conflicts. Externally use about 32,000 tons as a case-file figure until the contract settles it.
Q2: Is 141,900 m² land or GFA?
A: Land for phase I; building area in the file is about 280,000 m². Do not mix them.
Q3: Did Jiangxin take the campus main contract?
A: No. Scope is shop steel fabrication and delivery.
Q4: What is needed for a quote?
A: Drawings, quantities, span/loads, coating or fire-protection requirements.
Have a steel fabrication or procurement need?
Send your drawings and quantities for a drawing-based review and quote.