Shenzhen Pinghunan Logistics Hub

approx. 28,000 tons

Total Tonnage

Shenzhen Pinghunan Logistics Hub

Completion

2023

Location

Shenzhen, China

Category

Infrastructure

Have a steel fabrication or procurement need?

Send your drawings and quantities for a drawing-based review and quote.

FindingSteel (GUANGDONG JIANGXIN AUTO-MANUFACTURE STEELSTRUCTURE CO., LTD., Foshan Gaoming) fabricated phase I warehouse and distribution steel for the Pinghu South logistics hub in Shenzhen. Case file about 28,000 tons of long-span warehouse steel. Not the hub civil main contract.

Construction Process

Detail Design
Scheduling
Fabrication
Quality Inspection
Installation
01

At a glance

• Pinghu South logistics hub, Shenzhen, phase I • Steel about 28,000 tons • Type: long-span warehouse / distribution • Scope: steel fabrication; not hub main contract
02

Project overview

Shenzhen Pinghunan Comprehensive Logistics Hub is a key logistics facility in Shenzhen, located in Pinghu Street, Longgang District, covering approximately 800,000 square meters in total, constructed in multiple phases.
03

Technical highlights

• Multi-story stereoscopic warehouse steel structure: Adopting 3-4 story steel frame structure with maximum floor height of 12m. • Large-span logistics passage: Internal logistics passage adopts 24-36m large-span steel beams. • Anti-floating basement roof design: For high groundwater level geological conditions. • Logistics dynamic line optimization design: Steel structure column grid layout combined with logistics analysis. • Fast hoisting construction: Using crawler cranes and truck cranes for hoisting schemes.
04

What we supplied

• Logistics warehouse steel structure deepening design: Special deepening design based on logistics equipment parameters. • High-rise stereoscopic warehouse fabrication and installation: Using high-rise steel frame structure fabrication and installation technology. • Envelope system integration: Providing metal roofing, walls, loading platforms, canopies. • Quality inspection and acceptance: Professional QC team with ultrasonic flaw detection, coating thickness testing.
05

Quality and delivery

• Split to transport limits; roof and bracing shipped with main frames. • Marked by zone; shop and site share one drawing revision.
06

Key figures (case-file, approx.)

Location: Shenzhen Steel: about 28,000 tons Type: long-span warehouse steel Plant: Yanghe, Gaoming, Foshan; 25,000 m²; 40,000 t/year
07

FAQ

Q1: Is the phase area 500,000 or 800,000 m²? A: The register conflicts. This page does not state an unsettled area; it states about 28,000 tons and warehouse-steel scope. Q2: Did Jiangxin take the hub main contract? A: No. Scope is phase I warehouse steel. Q3: What is needed for a quote? A: Drawings, quantities, span/loads and coating or fire-protection requirements.

Have a steel fabrication or procurement need?

Send your drawings and quantities for a drawing-based review and quote.