Shenzhen Pinghunan Logistics Hub
approx. 28,000 tons
Total Tonnage

Completion
2023
Location
Shenzhen, China
Category
Infrastructure
Have a steel fabrication or procurement need?
Send your drawings and quantities for a drawing-based review and quote.
FindingSteel (GUANGDONG JIANGXIN AUTO-MANUFACTURE STEELSTRUCTURE CO., LTD., Foshan Gaoming) fabricated phase I warehouse and distribution steel for the Pinghu South logistics hub in Shenzhen. Case file about 28,000 tons of long-span warehouse steel. Not the hub civil main contract.
Construction Process
Detail Design
Scheduling
Fabrication
Quality Inspection
Installation
01
At a glance
• Pinghu South logistics hub, Shenzhen, phase I
• Steel about 28,000 tons
• Type: long-span warehouse / distribution
• Scope: steel fabrication; not hub main contract
02
Project overview
Shenzhen Pinghunan Comprehensive Logistics Hub is a key logistics facility in Shenzhen, located in Pinghu Street, Longgang District, covering approximately 800,000 square meters in total, constructed in multiple phases.
03
Technical highlights
• Multi-story stereoscopic warehouse steel structure: Adopting 3-4 story steel frame structure with maximum floor height of 12m.
• Large-span logistics passage: Internal logistics passage adopts 24-36m large-span steel beams.
• Anti-floating basement roof design: For high groundwater level geological conditions.
• Logistics dynamic line optimization design: Steel structure column grid layout combined with logistics analysis.
• Fast hoisting construction: Using crawler cranes and truck cranes for hoisting schemes.
04
What we supplied
• Logistics warehouse steel structure deepening design: Special deepening design based on logistics equipment parameters.
• High-rise stereoscopic warehouse fabrication and installation: Using high-rise steel frame structure fabrication and installation technology.
• Envelope system integration: Providing metal roofing, walls, loading platforms, canopies.
• Quality inspection and acceptance: Professional QC team with ultrasonic flaw detection, coating thickness testing.
05
Quality and delivery
• Split to transport limits; roof and bracing shipped with main frames.
• Marked by zone; shop and site share one drawing revision.
06
Key figures (case-file, approx.)
Location: Shenzhen
Steel: about 28,000 tons
Type: long-span warehouse steel
Plant: Yanghe, Gaoming, Foshan; 25,000 m²; 40,000 t/year
07
FAQ
Q1: Is the phase area 500,000 or 800,000 m²?
A: The register conflicts. This page does not state an unsettled area; it states about 28,000 tons and warehouse-steel scope.
Q2: Did Jiangxin take the hub main contract?
A: No. Scope is phase I warehouse steel.
Q3: What is needed for a quote?
A: Drawings, quantities, span/loads and coating or fire-protection requirements.
Have a steel fabrication or procurement need?
Send your drawings and quantities for a drawing-based review and quote.




