Guicheng No.1 Middle School

approx. 4,500 tons

Total Tonnage

Guicheng No.1 Middle School

Completion

2023

Location

Foshan, China

Category

Infrastructure

Have a steel fabrication or procurement need?

Send your drawings and quantities for a drawing-based review and quote.

FindingSteel (GUANGDONG JIANGXIN AUTO-MANUFACTURE STEELSTRUCTURE CO., LTD., Foshan Gaoming) fabricated long-span hall steel (gym and canteen) for Guicheng No.1 High School, Foshan. Campus GFA about 67,000 m². Steel on this page about 4,500 tons — halls only, not every campus building.

Construction Process

Detail Design
Scheduling
Fabrication
Quality Inspection
Installation
01

At a glance

• Guicheng No.1 High School, Nanhai, Foshan • Campus GFA about 67,000 m² • Steel about 4,500 tons • Scope: gym / canteen long-span steel, not every building
02

Project overview

Guicheng No.1 Middle School is located in Guicheng Street, Nanhai District, Foshan, one of the key middle schools in Foshan. The project has a total construction area of approximately 67,000 square meters.
03

Technical highlights

• Large-span gymnasium spatial structure: The gymnasium adopts 36m span steel grid structure with 12m clear height. • Seismic performance-based design: Designing with higher than local seismic fortification standards. • Special fire protection and anti-corrosion design: Steel structure surface uses thick fire-resistant coatings. • Green campus design: Using recyclable steel structure system. • Humanized detail design: Indoor steel structural components are rounded to avoid sharp edges.
04

What we supplied

• Large-span spatial steel structure design: Using PKPM, 3D3S and other structural design software. • Steel grid fabrication and installation: Using bolt sphere joint grid system. • Teaching facility steel structure supporting: Providing corridor, hanging equipment, stair railings. • Campus fences and gates: Providing main entrance gates, campus fences.
05

Quality and delivery

• Space-frame or long-span members trial-assembled in the shop where required. • Marked for a short lift window; campus site rules apply.
06

Key figures (case-file, approx.)

Location: Guicheng, Nanhai, Foshan Campus GFA: about 67,000 m² Steel: about 4,500 tons Plant: Yanghe, Gaoming, Foshan; 25,000 m²; 40,000 t/year
07

FAQ

Q1: Are class or pupil counts published here? A: No. Unconfirmed third-party figures exist in the register; this page omits them. Q2: Does 4,500 tons include teaching blocks? A: No. Hall steel in the case file. Q3: Did Jiangxin take the campus civil main contract? A: No. Scope is the long-span hall steel. Q4: What is needed for a quote? A: Drawings, quantities, span/loads and coating or fire-protection requirements.

Have a steel fabrication or procurement need?

Send your drawings and quantities for a drawing-based review and quote.