FindingSteel (GUANGDONG JIANGXIN AUTO-MANUFACTURE STEELSTRUCTURE CO., LTD., Foshan Gaoming) fabricated and supported installation of BIT Data Center steel in Manila. Case file: about 28,000 m² GFA, about 3,200 tons. Fire protection and coating follow approved drawings. Not the civil main contract.
Construction Process
Detail Design
Scheduling
Fabrication
Quality Inspection
Installation
01
At a glance
• BIT Data Center, Manila
• GFA about 28,000 m²
• Steel about 3,200 tons
• Scope: fabrication and installation support
02
Project overview
The BIT Data Center in Manila, Philippines is an important digital infrastructure project in Southeast Asia, with a total floor area of approximately 28,000 square meters and a steel structure weight of around 3,200 tons.
03
Technical highlights
• Data center special structural design: Using high-bearing-capacity steel frame structure to meet special requirements for data center floor loads.
• Fire and corrosion double protection: Steel structure surface uses thick fire-resistant coatings with 2-hour fire resistance.
• BIM fine modeling: Using Tekla Structures for high-precision 3D modeling.
• Precise floor height control: Through deepening design to optimize beam height, ensuring computer room clear height of not less than 3.2m.
• Seismic reinforcement design: Designing according to Philippine National Building Code (NBCP).
04
What we supplied
• Data center steel structure deepening design: Special deepening design based on server cabinet and precision equipment parameters.
• High-precision steel component fabrication: Using CNC equipment to fabricate various connection components.
• Shipping and customs clearance services: Providing full logistics services from domestic factories to Manila Port.
• On-site installation and debugging: Dispatching installation teams to provide on-site guidance.
05
Quality and delivery
• Detailed to the hall grid; re-measured to the drawing before packing.
• Fire and coating to the specification; the 800 kg/m² live load is not stated here.
06
Key figures (case-file, approx.)
Location: Manila, Philippines
GFA: about 28,000 m²
Steel: about 3,200 tons
Plant: Yanghe, Gaoming, Foshan; 25,000 m²; 40,000 t/year
07
FAQ
Q1: Can 800 kg/m² live load be published?
A: No. Unconfirmed in the register; omitted.
Q2: Did Jiangxin take the MEP main contract?
A: No. Scope is the steel frame.
Q3: What is needed for a quote?
A: Drawings, quantities, span/loads, coating or fire-protection requirements.
Have a steel fabrication or procurement need?
Send your drawings and quantities for a drawing-based review and quote.