Indonesia OBI Nickel Project
approx. 8,500 tons
Total Tonnage

Completion
2022
Location
Indonesia
Category
Overseas Projects
Have a steel fabrication or procurement need?
Send your drawings and quantities for a drawing-based review and quote.
FindingSteel (GUANGDONG JIANGXIN AUTO-MANUFACTURE STEELSTRUCTURE CO., LTD., Foshan Gaoming) fabricated smelter-shop and warehouse steel for the OBI nickel project on Obi Island, Maluku, Indonesia. Case file about 8,500 tons, with marine packing and site support. Not the mine main contract.
Construction Process
Detail Design
Scheduling
Fabrication
Quality Inspection
Installation
01
At a glance
• OBI nickel smelter shops / warehouses, Maluku
• Steel about 8,500 tons
• Scope: fabrication, coating, sea freight, site support
02
Project overview
The Indonesia OBI Nickel Project is a large nickel smelting project located on Obi Island, Maluku Province, Indonesia. Once completed, it will become an important global nickel intermediate product production base.
03
Technical highlights
• Tropical marine climate anti-corrosion design: For the high-temperature and high-humidity marine climate of Obi Island.
• Large-span industrial plant design: Smelting workshops adopt 24-36m large-span steel beams.
• High-temperature area fire protection: Areas near smelting furnaces use high-temperature fire-resistant coatings.
• Modular prefabricated export: Using factory modular prefabrication schemes.
• Localized construction support in Indonesia: Establishing cooperative relationships with local construction enterprises.
04
What we supplied
• Smelting workshop steel structure deepening design: Completing steel structure deepening design for blast furnace frames, raw material warehouses, and finished product workshops.
• Industrial plant fabrication and installation: Providing fabrication and on-site installation services for large-span steel beams, columns, and crane beams.
• Envelope system supporting: Providing metal roofing, wall panels, daylighting strips.
• Quality inspection and acceptance: Conducting material inspection and construction acceptance according to international standards.
05
Quality and delivery
• Coating to the tropical marine spec; split for lift and sea freight.
• Lists follow erection order; mill certs travel with the cargo.
06
Key figures (case-file, approx.)
Location: Obi Island, Maluku, Indonesia
Steel: about 8,500 tons
Delivery: sea freight + site support
Plant: Yanghe, Gaoming, Foshan; 25,000 m²; 40,000 t/year
07
FAQ
Q1: Is the owner’s full name published?
A: No. The register says the owner line is incomplete; this page names OBI nickel shops and warehouses only.
Q2: Did Jiangxin take the mine main contract?
A: No. Scope is smelter / warehouse steel with installation support.
Q3: What is needed for a quote?
A: Drawings, quantities, span/loads, coating or fire-protection requirements.
Have a steel fabrication or procurement need?
Send your drawings and quantities for a drawing-based review and quote.
More Featured Projects

Overseas Projects
Shopee Logistics & Warehousing Center, Philippines
Manila, Philippines

Infrastructure & Public Facilities
Sun Yat-sen University South Campus Sports Center
South Campus, Sun Yat-sen University, Haizhu, Guangzhou, China

Industrial Facility
Tuen Mun EcoPark Recycled Paper Pulp Facility Steel Structure Project
Tuen Mun EcoPark, Hong Kong, China