Steel Girders & Steel Beams

A steel girder is the main flexural member in steel structures, commonly used for crane girders in industrial plants, floor beams and bridge sections. We supply and fabricate welded girders to approved drawings, covering H-beam, box and crane girders, with cutting, drilling, end-plate and connection preparation, plus material certificates and inspection reports, professionally packed and shipped by sea from our Foshan factory.

Quick Specs

Standard
GB/T 11263-2024 (hot-rolled H-beam girders)
Material
Q235B / Q355B / Q355C / Q460C
Section
H-beam / welded box girder / built-up sections (to drawing)
Girder depth
100–900mm (common hot-rolled)
Length
6m / 9m / 12m or cut to drawing
Surface
Black / shot blasted / painted / galvanized

Capabilities

  • Crane girders, primary/secondary beams and box girders
  • H-beam steel from stock and welded girders to drawing
  • Cutting, drilling and end-plate preparation
  • Material certificates and inspection reports
  • Special inspection and surface treatment available
  • Packing, container loading and sea freight delivery

In-Stock Supply & Procurement

Common hot-rolled H-beam girders are supplied from stock, mainly in Q235B and Q355B. Actual material and sizes depend on current inventory;

send your requirements for confirmation.

For a stock enquiry, send the section designation, steel grade, quantity and required length. We confirm the current availability before reserving material; the page does not publish a fixed inventory list because stock changes by grade, size and order status.

If a project needs both rolled sections and fabricated members, the material list can be split into an in-stock package and a drawing-based fabrication package. That keeps procurement, cutting and welding decisions visible before production starts.

Welded Girders to Drawing

Crane girders, primary/secondary beams and box girders are assembled and welded to approved drawings, with tapered sections, stiffeners,

end plates and holes reviewed; achievable scope is confirmed by project review and actual equipment capacity.

A welded girder fabrication review normally checks the section depth, flange and web plate thicknesses, plate edge preparation, weld access, stiffener spacing, end plates, holes and lifting points. Any tapered or built-up girder is released only after the approved drawing and project interface are clear.

The phrase built-up girder describes a member assembled from plates rather than a single rolled section. It is useful when the required depth, opening, taper or connection arrangement is outside a standard H-beam series; the final section remains a design input, not a catalogue promise.

Quality & Inspection

Material certificates, dimensional inspection records and NDT reports are available per project requirements;

special inspection and surface treatment can be discussed.

Inspection records can include material certificates, heat-number traceability, dimensional checks after fit-up and welding, weld visual inspection and project-specified NDT such as UT, MT or PT. The exact hold points and acceptance criteria follow the inspection plan and approved drawings.

For a crane runway beam or crane girder, the inspection focus extends to rail-seat geometry, end-plate alignment, stiffener position, straightness and twist. Where required, a pre-assembly check can be arranged before packing so the site team receives a controlled member set.

Delivery

For common sizes, we confirm live stock first and can then arrange packing, container loading and transport. Non-standard sections or welded girders to drawing require a production schedule based on drawings, quantity and current capacity; sea freight remains the main method for overseas orders.

Long members are packed and marked against the member list. Depending on the route and lifting plan, a girder may ship as one piece or as transportable segments; end faces, machined edges and bolt holes are protected before container loading.

FindingSteel coordinates detailing, fabrication, inspection and export delivery from its Foshan production base. The wider business has a 25,000 m² production base and a 40,000-ton designed annual capacity; the capacity, schedule and site responsibility for each girder order are still confirmed during project review.

Girder Types: Plate, Box, Crane and Gantry

A plate girder is a welded I-shaped member made from plates and is selected when a project needs a deeper or non-standard section. A box girder is a closed section built from plates, with torsional stiffness and connection integration considered in the design. A crane girder, also called a crane runway beam in some specifications, supports the rail and moving-wheel loads of an overhead crane. A gantry girder is reviewed in the same drawing-led way when the gantry system needs a dedicated supporting member.

These names describe different structural roles, not four fixed stock sizes. FindingSteel can review plate girder, box girder, crane girder and gantry girder requirements against the approved drawings, load data, connection details, coating system and transport plan. Bridge-related members are handled as project-specific steelwork rather than as a general bridge design service.

Girder Sizes & Load Basis

Common hot-rolled H-beam references use a depth of about 100–900 mm, with common flange widths around 100–300 mm and web/flange thicknesses selected from the relevant section series. Typical stock lengths are 6 m, 9 m and 12 m; cut-to-length supply and welded built-up sections are reviewed from the drawing.

There is no safe universal table that maps one girder size to a span or crane tonnage. Span, dead load, live load, wheel load, lateral surge, deflection limit, restraint and connection design must be checked together by the project engineer. Send the design span, load cases, crane data and support details so the girder section can be confirmed instead of guessed.

Crane Girder Details

For a crane girder or crane runway beam, the enquiry should identify the rail or wheel interface, end plates, web and flange stiffeners, splice locations, bracket details and the required straightness or deflection criteria. These details control whether a rolled H-beam, welded plate girder or box-like built-up member is practical.

The fabrication sequence normally keeps stiffeners and end plates referenced to the same member marks as the approved drawing. After welding, key dimensions are re-measured and recorded; any pre-assembly or rail-seat check is agreed in the inspection plan before shipment.

Steel Girder vs Steel Truss: Selection Guide

A steel girder carries load mainly through bending and shear. A steel truss uses a triangulated arrangement so its members work mainly in tension or compression. The difference is therefore a difference in load path, not just a difference in appearance. Selection should consider span, load, available structural depth, clear height and fabrication or erection conditions together.

For a moderate span, limited headroom or concentrated heavy load, a solid-web girder is often the more direct option. When a long span allows additional structural depth, a truss may reduce the main-member steel weight, but it also adds nodes, member marks, pre-assembly, transport splits and site alignment work. A sound comparison includes fabrication, packing, sea freight and erection interfaces rather than steel tonnage alone.

Design & Fabrication Control Points

For girders, detailing should check compression-flange restraint, local plate slenderness, stiffener layout, welding sequence and post-weld straightening. A crane girder also needs the rail seat, end plates, stiffeners, straightness, twist and deflection criteria carried into the drawing and inspection plan.

For trusses, the technical focus moves to node geometry, member slenderness, camber and segment pre-assembly. Whether the final solution is a girder or a truss, detailing, fabrication, inspection and installation support should follow the same drawing revision so member marks, connection interfaces and site alignment remain consistent.

Frequently Asked Questions

What section forms are available for steel girders?

Commonly H-beam girders, welded box girders and built-up sections to drawing, determined by loading and drawings.

Can you fabricate crane girders?

Crane girder stiffeners, end plates and rail support requirements are reviewed per approved drawings, with scope confirmed by project review.

What is the lead time for standard and non-standard girders?

For common sizes, we confirm live stock first and can then arrange packing and transport. Non-standard sections or welded girders to drawing require a production schedule based on drawings, quantity and current capacity.

How much does a steel girder cost?

A steel girder quote depends on steel grade and weight, rolled or welded fabrication, cutting and drilling, stiffeners and end plates, coating, inspection, packing and sea freight. Send the drawing or a section/load list for a project-based quote.

What sizes of steel girders do you supply?

Common hot-rolled H-beam references cover roughly 100–900 mm in depth, with common 6 m, 9 m and 12 m lengths. Welded plate, box and built-up girders are sized from approved drawings rather than a fixed catalogue range.

Steel girder vs steel beam — what is the difference?

Beam is the broad structural term for a member carrying bending. Girder usually refers to a primary or heavier beam, but usage varies by project and region. The drawing, load path and connection details matter more than the label alone.

Can you fabricate box girders to drawing?

Yes, box girder fabrication can be reviewed from approved drawings covering plates, diaphragms, stiffeners, welds, end preparation, inspection and transport segmentation. The achievable scope is confirmed during project review.

What inspection reports come with each girder?

Depending on the order, documents may include material certificates, heat-number traceability, dimensional inspection records, weld inspection and project-specified NDT reports. The final document list follows the inspection plan and contract requirements.

Can a steel truss fully replace a steel girder?

No. A truss needs structural depth, so a solid-web girder may remain more suitable where headroom is limited, the floor zone is congested or the load is concentrated. Compare span, loads, deflection, node count and erection conditions together.

When should I compare a girder and a truss for the same span?

Compare both at the concept stage when the span is large, girder depth begins to control steel weight or deflection, or the building can accept additional structural depth. Include nodes, pre-assembly, transport splits and erection hours in the comparison.

What should overseas projects check before choosing a truss?

Check container dimensions, member segmentation, marks, packing, site lifting capacity and the preferred connection method in addition to structural design. Agree the split and erection interfaces during detailing, not after fabrication.

Related Pages

Related Projects

Request a Quote

Scan the QR code or tap a button to contact us directly. Send your size, grade, quantity or drawings; we reply after checking live stock and reviewing your requirements.

This block does not collect or store any data. The QR code and buttons open your own WeChat, WhatsApp, phone or email app.

  • Confirmed against live stock and drawing review
  • Material certificates and inspection documents available
WhatsApp QR code

WhatsApp

+86 139 2487 9674

Scan to chat

Send your girder sections and load requirements for a supply and fabrication quote.