Hongwang Group Headquarters
approx. 5,200 tons
Total Tonnage

Completion
2023
Location
Nanhai, Foshan, China
Category
Landmark Building
Have a steel fabrication or procurement need?
Send your drawings and quantities for a drawing-based review and quote.
FindingSteel (GUANGDONG JIANGXIN AUTO-MANUFACTURE STEELSTRUCTURE CO., LTD., Foshan Gaoming) took on main steel detailing, fabrication and installation for Hongwang Group Headquarters in Nanhai, Foshan. Case file: about 42,000 m² GFA, about 128 m tall, about 5,200 tons. Not the civil main contract.
Construction Process
Detail Design
Scheduling
Fabrication
Quality Inspection
Installation
01
At a glance
• Hongwang Group Headquarters, Nanhai, Foshan
• GFA about 42,000 m²; height about 128 m
• Steel about 5,200 tons (case file)
• Steel frame + SRC columns; BRB in the file
• Scope: main steel; not civil main contract
02
Project overview
Hongwang Group Headquarters is located in Foshan Nanhai Financial High-tech Zone, with a total construction area of approximately 42,000 square meters, building height of 128 meters, 28 above-ground floors and 3 underground floors.
03
Technical highlights
• Steel-concrete composite structure application: Adopting steel frame-core tube structure system with steel reinforced concrete (SRC) columns.
• Buckling restrained brace (BRB) seismic technology: Setting BRB as energy-dissipating seismic components.
• Unitized curtain wall steel structure integration: Integrated design of frame steel structure and unitized curtain wall support system.
• Construction stage structural analysis: Using MIDAS/Gen for full construction process simulation analysis.
• Green construction technology: Using tool-type protective frames and prefabricated stairs.
04
What we supplied
• Steel structure deepening design and optimization: Using Tekla Structures for 3D deepening design.
• Steel reinforced concrete component manufacturing: 450*450mm large steel bone production line.
• Buckling restrained brace manufacturing: Using self-developed BRB manufacturing process.
• On-site installation and quality control: Equipped with 20-year experienced installation team.
05
Quality and delivery
• Materials traceable by heat number; inspection records kept.
• SRC and BRB work recorded to the drawing set; one revision shop to site.
06
Key figures (case-file, approx.)
Location: Nanhai, Foshan
GFA: about 42,000 m²
Height: about 128 m
Steel: about 5,200 tons
Floors: about 28 / 3 basement
Plant: Yanghe, Gaoming, Foshan; 25,000 m²; 40,000 t/year
07
FAQ
Q1: Are the BRBs a proprietary Jiangxin product?
A: No. This page records fabrication to drawing; it does not claim a proprietary product.
Q2: Did Jiangxin take the civil main contract?
A: No. Scope is the main steel package.
Q3: Is 42,000 m² land or GFA?
A: GFA in the case file.
Q4: What is needed for a quote?
A: Drawings, quantities, span/loads and coating or fire-protection requirements.
Have a steel fabrication or procurement need?
Send your drawings and quantities for a drawing-based review and quote.