Definition of Large Span Space Steel Structure

Large-span space steel structure refers to steel structure systems with spans typically exceeding 30 meters,

using spatial grid or prestressed structures as the main load-bearing system.

They are widely used in stadiums, airport terminals, exhibition centers and large logistics warehouses.

Compared with conventional frame structures, spatial steel structures coordinate loads across the whole system to cover large column-free areas,

usually with a lower steel tonnage per unit of clear span.

Common forms include space trusses, latticed shells, cable-supported trusses and suspen-domes.

Which system is selected depends on roof loads, architectural form, lifting conditions and transport segmentation limits.

These systems place higher demands on detailing, fabrication precision, segment marking and site assembly sequence:

members are usually split to transport size, precision-fabricated and pre-assembled in the factory, then joined on site into the complete system.

Key Points in Hoisting

Hoisting large-span steel structures requires considering member weight, center of gravity, lifting point layout, equipment selection,

site assembly space and construction conditions.

Lifting points should be determined during detailing, with temporary lifting lugs pre-positioned where necessary;

segment weight should match the rated capacity of the crane, and the actual lifting capacity at the working radius must be checked.

In Shenzhen Pinghu South Comprehensive Logistics Hub Phase I, for example,

the phase covers about 500,000 sq m with roughly 35,000 tons of structural steel;

the large spans and high member count placed very strict requirements on lifting equipment selection, access routes and construction organization.

Site planning should cover assembly yards, lifting sequence and road bearing capacity to avoid congestion and double handling.

Lifting windows should also account for wind and rain, with hardened ground and crane standings checked for safety;

large members deserve a pre-lift trial and a dedicated technical briefing before formal lifting.

Design of Temporary Support Systems

Before a large-span structure becomes self-stable, it often relies on temporary support systems.

Temporary support design must consider self-weight, construction loads, wind loads and the stability of the support frames themselves;

support point positions and elevations are usually back-calculated from the final structure geometry.

Staged unloading controls the final geometry and deformation:

supports are removed in a computed sequence so loads transfer gradually to the permanent system,

avoiding excessive deformation or local stress concentration from one-shot release.

Displacement and deformation should be monitored throughout unloading, with key node elevations re-verified.

After their task is completed, the support frames are dismantled in the planned order, and the final elevations are checked against the design values,

which then serve as the basis for roof leveling and cladding installation.