Why There Is No Fixed Detailing Fee
Detailing turns the design intent into a manufacturable, transportable and erectable model, shop drawings and material lists.
The workload varies greatly with drawing complexity, member count, connection details, standard requirements and revision rounds,
so there is no fixed per-square-metre or per-tonne price.
Two buildings of similar area can differ by several times in detailing effort once non-standard connections are involved.
Common Pricing Models
Detailing is usually priced in one of four ways, and suppliers often combine them depending on the project:
- Per drawing set: priced by shop drawing or erection drawing sheets, suitable for regular scopes;
- Per member or tonnage: based on member count or steel tonnage, common for repetitive industrial buildings;
- Per model depth and man-hours: priced by time spent on modelling, shop drawings, clash detection and bills of materials;
- Per schedule lump sum: a package price by project milestones, best when scope is clear and changes are controlled.
| Pricing model | Best suited to | What to watch out for |
|---|---|---|
| Per drawing set | Regular scopes with predictable drawing volumes | Agree what one sheet covers (how many members) |
| Per member or tonnage | Industrial buildings with repetitive members | State how non-standard members are converted to standard units |
| Per model depth and man-hours | Projects requiring 3D modelling, clash detection and BOMs | Define deliverables clearly so hours do not run without limit |
| Per schedule lump sum | Clear scopes with controlled changes | Write revision limits and change pricing into the agreement |
Main Cost Drivers
- Member types and quantity: standard H-beam members cost less than complex irregular connections;
- Connection complexity: beam-to-column joints, diaphragms and stiffeners add significant work;
- Model depth and deliverables: whether 3D models, clash detection, BOM and model review are included;
- Standard and language: issuing drawings to GB/T, ASTM or EN, and English drawing requirements;
- Drawing completeness and revisions: complete input drawings and controlled changes keep the fee predictable.
How to Get a Clear Quote
Provide the structural design drawings or model, a member list, connection notes, the drawing standard and language,
the deliverable list and schedule, and ask the supplier to state in the quote what is included, what is excluded, and how revisions are charged.
Only then are quotes comparable. To assemble the inputs, work through our RFQ information checklist item by item.
Frequently Asked Questions
Who normally carries out the detailing?
The design institute, a specialist detailing company, or the fabricator itself.
Having the fabricator detail the work usually improves the handover between drawings and workshop practice,
but always confirm separately whether the detailing fee is already inside the fabrication price, so it is not charged twice or omitted.
How are drawing revisions charged?
There is no universal rule.
The first, well-defined issue of drawings is normally within the original fee,
while major changes from the client or the design are usually priced by the scope of the revision.
Agree in writing how many revisions are free and how extra ones are billed before you sign.
Who owns the use of the detailing output?
It depends on the contract.
A common arrangement gives the client the right to use the deliverables for this project's fabrication and erection, while modelling methods,
internal standards and proprietary detailing practices remain with the supplier.
If transfer to a third party or reuse on another project is needed, confirm the licence scope in advance.
Detailing is often priced together with fabrication; see our steel detailing service and steel fabrication service;
for member scope, see the H-beam page and box column page. For how detailing and fabrication are priced together, see our fabrication pricing guide.
Send us your drawings and requirements for a drawing-based review and quote.